EN

EN

EN

Energy and mobility

Energy and mobility

Deploy charging points where vehicles stop, not where there is space left

Deploy charging points where vehicles stop, not where there is space left

energy and mobility hero

The problem we're solving

Today

The rollout of charging points is accelerating under regulatory pressure and the growth of the electric vehicle fleet.

But the siting criteria often remain technical:
available grid connection, available parking space.

The result is imbalanced.


You observe:

underused charging points in some locations

queues elsewhere

a rollout that does not match actual usage

With Urban Radar

You combine flow and parking data
with the territorial context

You identify the locations
where a charging point will actually be used

You deploy your network
based on actual usage, not technical constraints alone

What this means for you

You prioritise your deployment investments
in the locations with the greatest usage potential

You size your charging infrastructure
according to actual stopping profiles

You identify the coverage gaps in your network
where traffic justifies deployment

You justify your site selection choices
to funders, local authorities or regulators

You measure the actual usage of your charging stations
to adjust and optimise your network

Use cases

vehicle flow visualisation

Vehicle flows and origins-destinations

Know what is moving through your territory, how much, via which routes, where it comes from and where it is going

Parking overview

Parking and stopping

Measure the actual occupancy of your parking and delivery areas

visualisation corridors

Corridors and transit

Identify the transit corridors that structure an area and measure what actually moves through them

graphical visualisation of mobility

Dynamic mobility observatory

A complete view of mobility, whatever the sensor

electric vehicle charging point map

Positioning of electric vehicle charging stations

Identify the on-street locations where a charging point will actually be used

Are you planning a roll-out of terminals?

Are you planning
a rollout
of charging points?